Planning this event started in July 2005. The AIM was to sponsor British Wireless for the Blind after a 2 year break. To keep costs to a minimum, and a change of location it was decided to take the event to Hendon North London. Various permissions had to be gained first for the use of the site (being the home of The Metropolitan Police Training College). 1. Authority from the Commander. All was gained over a period of time, to run the station for 24 hours. It was decided that this would be 10:00am Saturday through to 10:00am Sunday. A total of 17 members arrived throughout various times of the day and evening. Equipment: - Yaesu